We open
the corridor.
Pipeline mainline, transmission corridor, highway right-of-way, energy development. Fourth Generation Loggers. Highly skilled operators. 25 years cutting for major utilities and pipeline GCs · zero reportable incidents in 24 months.
Safety first. Production right behind it. A production-felling fleet and decades-deep operators clearing pipeline, transmission, highway, and energy-development corridors east of the Colorado River.
The schedule holds, the safety record holds, the corridor opens. That's been the posture for 25 years — OSHA 30 + SAFER on every site, energized-line clearance protocols honored, $5M GL over every project. The Indiana shop carries the largest barsaw in the country plus a TimberPro feller buncher, a Tigercat skidder, and track mulchers. End markets: midstream operators, IOUs, rural co-ops, DOTs, energy-development GCs, veneer mills, and stave operators.
37 states.
One phone number.
On the deck.
Linear footage and acreage cut in the past 12 months. Verified, not aspirational.
- 230mi
- Pipeline ROW
- 80mi
- Transmission ROW
- 500ac
- Solar field
- 200ac
- Rock quarry
- 400ac
- Housing + industrial development
- 0
- Reportable incidents · 24 months
- 25+
- Years for utilities + pipeline GCs
- 37
- States east of the Colorado
